← All Services

Walkway & Sidewalk Coatings

Entries, paths, and steps finished with a high-grip texture, tying the approach to the house into the same finish as the patio or driveway.

  • Aggressive texture where slips actually happen: steps and entries
  • Matches the patio or driveway finish for a continuous look
  • Covers pitting and surface spalling on older paths
  • Small enough footprint to add onto a larger job cheaply

Commonly used for: Front entries, Side paths, Steps and landings

A slab under the gray moisture-vapor barrier coat, glossy enough to reflect the open door and the shelving on the back wall
From a garage job: the moisture-vapor barrier over the ground slab. Walkways and steps get the same first coat, then more texture than anything else we coat.

What to Expect

Walkways are a safety surface first and a good-looking one second. Wet leaves and Northwest drizzle make smooth concrete slick, so every walkway we coat gets plenty of texture. They also pair well with a patio or driveway job, since running the same finish across both makes the whole approach look like one piece.

Every one of these is built the same way: grind the slab back to bare concrete, lay a moisture-vapor barrier, then the epoxy base coat, then a polyaspartic topcoat over the top. More on how we build a floor.

Finishes That Suit It

Chip Flake

Color flakes broadcast into the wet base coat, then sealed under a clear topcoat. Hides dust, tire marks, and small debris better than anything else we install.

Quartz

Colored quartz broadcast into the resin for a dense, stone-like texture. The most slip-resistant option, which is why it goes outside most often.

Questions About Walkway & Sidewalk Coatings

Can you coat steps too?

Yes. Steps and landings get the same prep and build as the path, and the treads get the most texture, since that is where people slip.

Is it worth coating only a walkway?

It can be, especially at an entry that stays wet or already has a slip problem. Most walkway work gets added onto a patio or driveway job, though, since the equipment is already on site and the finishes can match.

Get a Quote for This Job

Free on-site estimate, written quote, no pressure.

Get a Free Quote